Waste Gas Treatment Services, From Drawing To Handover

We design, fabricate, deliver and commission polypropylene waste gas treatment equipment against the drawings and site conditions you actually have — scrubbers, activated carbon towers, ductwork, tanks, pumps and fans from a single supplier.

  • Drawing review
  • PP fabrication
  • VOCs & odour
  • Ductwork & fans
  • Installation support
  • Media & spares

What we do

One Supplier From Drawing To Commissioning

A waste gas system usually fails at the interfaces: between the hood and the duct, between the scrubber and the fan, between the fan and the stack. Split those interfaces across three suppliers and the plant ends up with a system nobody can tune. We take the whole chain instead — drawing review, fabrication, trial assembly, delivery, installation guidance and handover — so the equipment and the plant it sits in are designed together.

Xicheng Environmental Protection Technology (Suzhou) Co., Ltd. was established in Kunshan, Jiangsu in September 2009. The group now runs 40+ manufacturing facilities and offices across China and two factories in Vietnam, and exports to more than 80 countries. Every item we quote for waste gas treatment is built in-house: PP scrubber towers, activated carbon adsorption towers, moulded and welded ductwork, valves, pumps and tanks.

You do not need a finished specification to start. Send the drawing you have, the gas volume you measured and the space the plant will give you, and the engineering team will work from there.

Our services

Six Things We Take Off Your Side Of The Table

01

Engineering Design And Drawing Review

We work from your process data, not from a catalogue page. Gas volume, temperature, pollutant load and available footprint decide the tower diameter, packing height, residence time and duct sizes we design to. If a drawing cannot physically work on site, we say so before fabrication starts rather than after the equipment arrives.

  • Material selection for acid, alkali, solvent or odour duty
  • Tower and duct sizing checked against your measured air volume
  • Dimensioned fabrication drawings issued for approval
02

PP Scrubber And Tower Fabrication

Wet scrubbers and packed towers in polypropylene, built to the drawings we agree together. Spray, packed-bed and multi-stage arrangements cover acid gas, alkaline gas, ammonia, NOx and SO2 duty. Wall thickness and joint details are chosen for the duty temperature and for the chemistry inside the tower, not copied from a standard sheet.

  • Polypropylene bodies welded with ribbed reinforcement
  • Packing media, mist eliminators and spray headers
  • Nozzles, sight glasses and inspection ports placed for real access
03

VOCs And Odour Control

For organic vapours and smell, a wet scrubber on its own is not enough. We combine an upstream scrubber stage with an activated carbon adsorption tower, or supply the carbon stage alone where the gas is already cool and dry. Media grade and bed depth are selected against the pollutant and against the replacement or regeneration plan you want to run.

  • PP activated carbon adsorption towers
  • Granular activated carbon media supply
  • Combined scrubber and carbon trains
04

Ductwork, Fans And Fittings

Round and square PP duct, elbows, tees, reducers, flanges, dampers and hoods, with PP and FRP centrifugal fans sized to the system resistance. Parts up to 450 mm are injection moulded for a uniform wall and a clean finish; larger duct and fittings are fabricated and welded from sheet. Custom sizes are standard, including shapes that appear on no list.

  • Round, square and rectangular duct sections
  • Manual and electric duct dampers
  • PP and FRP centrifugal blowers
05

Tanks, Pumps And Dosing

A scrubber needs the liquid side as much as the gas side. We supply PP chemical storage and pickling tanks, dosing tanks, and centrifugal and chemical pumps sized to the spray flow and the number of spray stages inside the tower. Tanks can be dimensioned to the footprint you have left, not to a fixed range.

  • PP storage, pickling and dosing tanks
  • Polypropylene centrifugal and chemical pumps
  • Tank, pump and piping delivered as one assembly
06

Installation And After-Sales

We dispatch engineers to site to direct installation and to check the system before start-up. Equipment carries a 12-month warranty and activated carbon media 6 months, with spare parts and replacement media supplied from the line the original was produced on. The drawings we hand over are the drawings the spare part will be made from.

  • Engineers on site during installation
  • 12-month equipment warranty, 6-month media warranty
  • Spare parts and replacement media supply

What Reaches Site With The Equipment

Approved drawingsDimensioned fabrication drawings signed off before production.
Trial-assembled checkMating parts fitted in the workshop so site joints close first time.
Packing list and loading planEach crate numbered against the drawing it belongs to.
Installation and start-up guideSequence, torque values and the checks to run before first start.

Why Xicheng

Why Choose Xicheng?

Because the equipment is ours. We are not forwarding three vendors’ manuals for a system nobody owns end to end. The scrubber, the duct, the fan and the tank are designed by one engineering team, built in our own workshops and delivered on one schedule — which is also why the interfaces between them close.

That matters most when something has to change on site. A dimension that does not fit, a duct run that has to move, a pump that has to be resized: the answer comes from the people who cut the sheet, not from a distributor waiting on a factory that has never seen your plant.

Fabrication takes place in our own facilities, and the parts and spares you order later come from the same drawings. See the production environment and the certifications behind that claim.

17Years in equipment production, since September 2009
40+Manufacturing facilities and offices across China
80+Countries our equipment is exported to
ISO9001 and 14001, plus CE, SGS and RoHS

Next step

Send Us The Drawing

Tell us the gas, the volume and the space you have. We will size the system, issue drawings and quote against them.